New Home Construction Stage Inspections
Estimated arrival time: Within 24 hours
Description
Independent new home construction stage inspections provide ongoing quality control throughout the residential build process. Conducted in accordance with Australian Standard AS4349.1-2007 and New South Wales building standards, these inspections cover four key milestones: pre-slab, frame stage, lockup pre-plaster stage, and completion handover or pre-completion inspection. Each stage inspection checks compliance with approved engineering design drawings, the Building Code of Australia, and relevant standards. Pre-slab checks assess foundation set-up prior to concrete pouring. Frame stage evaluates slab perimeters, wall frames, truss bracing, and plate overhangs. Lockup and PCI stages identify non-compliant finishes or structural items before final settlement. Detailed PDF reports with photos are delivered within 24 hours for each stage, giving homeowners factual evidence to communicate directly with their builder and ensure defective work is corrected.
Service coverage
- concrete slab foundation
- wall frames
- roof trusses and bracing
- perimeter slab edges
- windows and exterior doors
- ceilings
- internal joinery
- fixtures and fittings
Sample reports
Pre Slab Stage Inspection Sample Report
Sample pre-slab stage inspection report.
Frame Stage Inspection Sample Report
Sample frame stage inspection report.
Lock up Stage Inspection Sample Report
Sample lock-up stage inspection report.
Completion (Handover/pCI) Stage Sample Report
Sample completion stage inspection report.