Inspection guide
PCI / New Build Handover
About this inspection
What it is and why it matters
A practical-completion inspection of a new home before final payment and handover. It records incomplete work, poor finishes and visible defects for the builder to address.
Defects are easier to resolve while the builder still controls the site and final payment is outstanding. A written list also makes rectification requests specific and easier to track.
What inspectors usually check
- Paint, plaster, tiling, flooring, cabinetry and fixtures
- Doors, windows, locks and visible seals
- Wet-area falls, sealing and accessible drainage points
- External finishes, brickwork, cladding, gutters and incomplete work
A PCI is an independent defect inspection, not the statutory building surveyor's approval. Plans, contracts and agreed finish schedules should be available where possible.
Typical cost
Average price
- 1–2 bedroom home
- $480
- 3–4 bedroom home
- $545
- 5+ bedroom home
- $575
- Apartment or unit
- $450
Indicative Australian averages rounded from current InspectorFind listings. Very large homes and repeat inspections may cost more.
Timing
Scheduling and demand
- When to schedule
- After practical completion and before final payment.
- Typical arrival
- Within one to three business days.
- Demand
- High near settlement and year-end handovers.
Know which inspection you need? Search inspectors by suburb from the homepage.
Find an inspector