Property inspections in Windsor, Melbourne
Inspection type
Arrival time
New Home Inspection
BSS Group are independent building consultants that provide new home inspections in and around Melbourne. Our team of experts provide an unmatched service across the full…

BSS Group Building Inspections Melbourne
Pre-completion (PCI/Handover) Inspection
Est. arrival time: Within 24 hours
- Interior and exterior of the new building
- Roof space
- Roof exterior
- Fixtures and fittings
- Overall workmanship
The completion stage or PCI (Practical Completion Inspection) handover inspection is a vital step conducted before you take final possession of your newly constructed home in…
iSPECT Building Inspections - Caroline Springs
House Handover Inspection
- Brickwork
- Articulation joints
- Window sills
- Wall bearing
- Mortar strength
- Mortar cleanup
- Cladding (Hebel/weatherboards)
- Guttering/fascia/eaves
- Roof tiles
- Glazing
- Infill/linings
- Doors & hardware
- Window reveals
- Plaster joints
- Ceilings
- Cornices
- Walls & skirting
- External corners
- Kitchen/vanity surfaces
- Tiling & grouting
- Tap cut-outs
- Caulking
- Paint finish
- Bath support
- Plumbing fixtures
- Insulation
- Heating platform
- Roof sarking
This service provides a thorough pre-handover inspection for new homes in Melbourne, helping buyers identify defects before finalizing ownership. It empowers homeowners with…

New Home Inspections - Melbourne
Comprehensive New Home Inspection Report
- Structural Integrity: Assessing the foundation, walls, and roof structure for stability and durability.
- Roofing and Exteriors: Examining roofing materials, gutters, and external cladding for proper installation and potential vulnerabilities.
- Interiors and Finishes: Inspecting walls, ceilings, floors, doors, and windows to ensure flawless finishes and functional operation.
- Plumbing Systems: Non-Invasive Visual Inspection Only – Checking pipes, fixtures, and drainage for leaks.
- Electrical Systems: Non-Invasive Visual Inspection Only – Verifying that wiring, outlets, and electrical panels are safely installed.
- HVAC Systems: Ensuring heating, ventilation, and air conditioning systems are correctly installed and operational.
- Insulation and Ventilation: Confirming that insulation materials are properly placed and that ventilation systems function effectively to promote energy efficiency and indoor air quality.
- Safety Features: Evaluating smoke detectors, carbon monoxide detectors, and other safety installations for proper placement and operation.
A New Home Inspection Report is an essential evaluation conducted upon completion of new residential construction, designed to verify the workmanship, structural integrity, and…
Jacsbuilt - Building Inspections, Expert Witness Services & Renovations
Pre-Completion (PCI/Handover) Inspection
Est. arrival time: Within 24 hours
A comprehensive pre-completion or handover inspection (PCI) is a vital service for newly constructed homes and apartments, ensuring that all building works have been executed to…
iSPECT Building Inspections - Reservoir
Pre-completion (PCI/Handover) Inspection
Est. arrival time: Within 24 hours
- Interior finishes
- Exterior finishes
- Roof space
- Living spaces
- Bedrooms and bathrooms
The Pre-completion or Practical Completion Inspection (PCI) is the final and most critical check before you take possession of your newly constructed home or apartment. Conducted…
iSPECT Building Inspections - Ringwood
Pre-Handover Inspection
Est. arrival time: Flexible (1-2 weeks+)
Ensure your newly constructed property is ready with a Pre-Handover Inspection from OCPS Building Inspections. Operating throughout Melbourne and surrounding suburbs like Bayside,…

OCPS Building Inspections
Handover Building Inspections
- Base Stage – this takes place immediately before the slab is poured
- Frame Stage – this inspection will be done once the initial framework is complete
- Lock-up Stage – this will occur on the completion of the roof being laid, windows installed and external cladding completed
- Fixing Stage – Internally the house is inspected for plaster, cabinetry, tile and carpentry defects.
- Handover or Practical Completion – this is an in-depth inspection that will be done only after the builder is completely satisfied that the construction is finished and after everything has been cleaned up
- Warranty Inspection – this will be conducted within one year as a follow-up or second handover inspection to check for any defects that may have presented themselves, all of which your builder is liable to rectify as a part of his extended warranty
Our handover inspections team is able to assist in this regard by providing support and advice, while also carefully assessing and inspecting every stage of the building process.

Inspector Hawkeye
New Home & Townhouse Pre-Handover Inspections
- Building exterior
- Dwelling interior
- Roof space
- Sub-floor area
- Surrounding land
- Site drainage
Finalinspect provides completely independent pre-handover inspections for new homes and townhouses throughout metropolitan Melbourne and the Mornington Peninsula. Strongly…
FINALINSPECT - NEW HOME INSPECTIONS - MELBOURNE










